EasyManua.ls Logo

Dunster House Monkey bars - Tools Required for Assembly; Preparation for Assembly

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TOOLS REQUIRED
Page 3
Preparation for Assembly
To build your Play System you will/may need:
2 people -
there are some heavy components.
Instructions -
readily at hand to begin building.
Gloves -
if you wish to use protective gloves as a precautionary measure.
Knee pads -
if you wish to use protective knee pads as a precautionary measure.
Spirit level -
check everything is plumb and level.
Measuring tape -
measure to help identify correct length timbers.
A stepladder -
to safely work at height.
Drill -
pre-drilling holes for screws.
Screwdriver bit for drill -
there are a lot of screws to screw in.
3 mm, 6mm, 8mm and 10mm drill bit -
remember to pre-drill holes for screws.
Socket wrench with 6mm, 8mm, 10mm, 17mm, or adjustable spanner -
connecting larger timber
assemblies.
Sandpaper -
to round out any sharp edges or corners.