EasyManua.ls Logo

Dyness LV-Link A - Page 16

Dyness LV-Link A
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LV-Link A User Manual
©Dyness reserves the copyright of this document
14
Unpacking Inspection
When the equipment arrives at the installation site, loading and unloading should
be carried out according to the rules and regulations, to prevent from being exposed
to sun and rain.
Before unpacking, the total number of packages shall be indicated according to the
shipping list attached to each package, and the case shall be checked for good
condition.
In the process of unpacking, handle with care and protect the surface coating of the
object.
Open the package, the installation personnel should read the technical documents,
verify the list, according to the configuration table and packing list, ensure objects
are complete and intact, if the internal packing is damaged, should be examined and
recorded in detail.
Table 3-3 Packing List
Engineering coordination
Attention should be paid to the following items before construction:
Power line specification.
The power line specification shall meet the requirements of maximum discharge
current for each product.
Mounting space and bearing capacity.
Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
Wiring.
Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Item
Specification
Quantity
Figure
LV-Link
LV-Link A
1
Power supply
cable
Red
/4AWG/L250mm
1
Communication
cable-to inverter
Black
/L2000mm /Double
RJ45 plug
1
User Manual
User manual
1
Expansion screw
Expansion screw
2