Unpacking Inspection
• When the equipment arrives at the installation site, loading and unloading should
be carried out according to the rules and regulations, to prevent from being exposed
to sun and rain.
• Before unpacking, the total number of packages shall be indicated according to the
shipping list attached to each package, and the case shall be checked for good
condition.
• In the process of unpacking, handle with care and protect the surface coating of the
object.
• Open the package, the installation personnel should read the technical documents,
verify the list, according to the configuration table and packing list, ensure objects
are complete and intact, if the internal packing is damaged, should be examined and
recorded in detail.
Table 3-3 Packing List
Engineering coordination
• Attention should be paid to the following items before construction:
Power line specification.
• The power line specification shall meet the requirements of maximum discharge
current for each product.
Mounting space and bearing capacity.
• Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
Wiring.
• Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.