Plug hole
Plug holes with the most open aperture are
recommended, whereas grill or perforated type
plug holes should be avoided as they restrict the
drainage of soapy water (lather). Do not use
plugs in the plug holes in the sinks.
Mounting the motor bucket (AB09/AB10)
Ensure 100 mm minimum clearance from
bottom of motor bucket to floor/wall.
The motor bucket cannot be mounted
upside down or installed above the sink.
Only the following is advised (Fig.11).
Installing AB11
The AB11 Dyson Airblade Tap hand dryer is designed
so that the motor unit is located behind a stud wall
within a metal enclosure which is supplied with the Dyson
Airblade Tap hand dryer (Fig.12). The vertical wall studs
must be constructed so as to allow the metal enclosure
to be fitted between them (Fig.13). One of the horizontal
wall studs must be fitted a) so it holds the main weight
of the metal duct and the unit, and b) so it is in the
correct position for the tap stem.
For complete instructions, please refer to the printed
installation guide supplied with the machine.
It’s also available online at www.dyson.com.au/docs
46 47
100 mm
Fig.11 Fig.12 Fig.13 Fig.14 Fig.15
Fig.11 Only the following is advised. Fig.12 AB11 metal enclosure assembly. Fig.14 Install plasterboard. Fig.15 Install Dyson Airblade Tap hand dryer.
WallShort
Long
100 mm
LN
LN
LN