EasyManua.ls Logo

E-Mu B-3 - Setup; Unpacking; Basic Operations; Front Panel Overview

E-Mu B-3
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B-3 Operation Manual 13
Setup
This section thoroughly describes how to set up your new B-3 for use. Setup
includes unpacking instructions and how to connect the cables.
Unpacking Carefully remove B-3 from the packaging material. Take care to save the
packing materials in case you need to transport the unit. Check to make
sure all components are included and in good condition. If there are
missing or damaged components, contact E-MU Systems immediately for
replacement or repair.
The B-3 box should include the following components:
B-3 rack unit
Power cable
Rack mounting ears
This Operation Manual

Table of Contents

Related product manuals