14
Lifting Instructions
FAILURE TO FOLLOW THESE INSTRUCTIONS COMPLETELY WILL VOID WARRANTY.
1. Transporting unit to
installation site: Always lift a
unit from the bottom for the
purpose of transportation.
The station should be
received attached to a pallet
for this purpose. Never roll a
station or move it on its side.
2. No Ballast (to be poured in
place): If the concrete anchor is
to be poured while the station
is in place lift the unit using 2
nylon straps wrapped under
the tank ange to make a sling,
as shown below. Keep station
oriented vertically to avoid any
damage.
3. Precast Ballast: Never
lift a station that has a ballast
attached by any means except
the rebar. The weight of the
concrete will damage the
station if you attempt to lift it
from any part of the station.