EasyManua.ls Logo

E-Z UP PATRIOT 10' X 10' INSTANT SHELTER User Manual

E-Z UP PATRIOT 10' X 10' INSTANT SHELTER
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTRUCTION SHEET
OPENING THE SHELTER FRAME
Place your E-Z UP
®
frame in the center of the area
to be sheltered.
Lift and partially pull the shelter frame apart.
1
2
3
4
5
ATTACHING THE SHELTER TOP
Place the vent top over the top part of the frame
and slip the corners into the pockets.
Unfold the fabric top and place on top of the frame.
Secure the fabric top to the corners of the frame
using the hook and loop connections.
LOCKING THE FRAME
From under the shelter, use one hand to push
the ONE-UP
TM
hub straight up until it clicks
into the pole.
ADJUSTING THE SHELTER HEIGHT
Finish securing the frame inside the shelter
top using the hook and loop strips.
Press the toggle adjustment on each leg and
raise or lower to adjust the shelter height.
SECURING THE SHELTER IN PLACE
Insert the supplied stake into the foot of each shelter leg.
SET UP
(1) 10’ PATRIOT
TM
Frame, (1) Water-Resistant Fabric Top,
(1) Vented Top, (1) 4-Piece Spike Kit, (1) Trax
TM
Roller Bag
Includes:
4x
Click
Question and Answer IconNeed help?

Do you have a question about the E-Z UP PATRIOT 10' X 10' INSTANT SHELTER and is the answer not in the manual?

E-Z UP PATRIOT 10' X 10' INSTANT SHELTER Specifications

General IconGeneral
BrandE-Z UP
ModelPATRIOT 10' X 10' INSTANT SHELTER
CategoryTent
LanguageEnglish

Summary

Setting Up the Patriot Instant Shelter

Opening the Shelter Frame

Place the E-Z UP frame and lift to partially pull the shelter frame apart for setup.

Attaching the Shelter Top

Place the vent top, unfold the fabric top, and secure it to the frame corners.

Locking the Frame

Push the ONE-UP hub straight up until it clicks into the pole to lock the frame.

Adjusting the Shelter Height

Secure frame with hook and loop, then press leg toggles to raise or lower shelter height.

Securing the Shelter in Place

Insert supplied stakes into the foot of each shelter leg to secure the structure.

Takedown Procedures

Performing Takedown

Retract legs, unlock the frame hub, close the shelter, and slide into the storage bag.

Shelter Care and Maintenance

Cleaning and Drying

Clean the top with mild soap and water; ensure it dries completely before storing.

Frame Maintenance

Wipe the frame with silicone spray and tighten bolts if loose for optimal performance.

Leak Repair

Use a seam sealer to fix any leaks or drips in the shelter top.

Replacement Parts and Warnings

Replacement Parts

Information on ordering replacement parts for all shelter sizes.

Flammability Warning

Keep shelter fabrics away from flame and heat sources as they may burn.

Related product manuals