Do you have a question about the E-Z UP PATRIOT 10' X 10' INSTANT SHELTER and is the answer not in the manual?
Place the E-Z UP frame and lift to partially pull the shelter frame apart for setup.
Place the vent top, unfold the fabric top, and secure it to the frame corners.
Push the ONE-UP hub straight up until it clicks into the pole to lock the frame.
Secure frame with hook and loop, then press leg toggles to raise or lower shelter height.
Insert supplied stakes into the foot of each shelter leg to secure the structure.
Retract legs, unlock the frame hub, close the shelter, and slide into the storage bag.
Clean the top with mild soap and water; ensure it dries completely before storing.
Wipe the frame with silicone spray and tighten bolts if loose for optimal performance.
Use a seam sealer to fix any leaks or drips in the shelter top.
Information on ordering replacement parts for all shelter sizes.
Keep shelter fabrics away from flame and heat sources as they may burn.