INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Easco Boiler Corp 1175 Leggett Ave Bronx, NY 1047 T: 718.378.3000 F: 718.378.4560 info@easco.com easco.com
Page 3 of 46
CONTENTS
PREFACE AND STATEMENTS 2
IMPORTANT INFORMATION 5
SECTION 1: GENERAL 9
1.1 Introduction 9
1.2 Specification Requirements & Approvals 9
SECTION 2: REQUIREMENTS 10
2.1 Installation & Service Qualification 10
2.2 Operation, Care & Continued Maintenance Qualification 10
2.3 Codes, Standards, Local Jurisdictions Utilities 10
2.4 Warranty 11
SECTION 3: IDENTIFICATION AND CONFIGURATION 12
3.1 Manufacturer’s Data Plate 12
3.2 ASME Name Plate 12
3.3 Manufacturer’s Data Report 12
3.4 Configurations 13
SECTION 4: INSTALLATION INSTRUCTIONS 14
4.1 Inspection of Equipment Shipment 14
4.2 Placement Setting of Equipment 15
4.3 Flue Gas Venting Requirements 16
4.4 Combustion and Ventilation Air Supply 16
4.5 Equipment Field Connections 17
4.6 Operating Controls and Safety Devices 18
4.7 Fuel Burning and Handling Equipment 19
4.8 Domestic Hot Water Tankless Heater 19
4.9 Boil-Out Instructions 20
4.10 Cleaning a New Steam Boiler 23
4.11 Cleaning a New Hot Water Boiler 24
SECTION 5: OPERATION INSTRUCTIONS 26
5.1 BoilerOperation 26
5.2 Feed Water Connection 27
5.3 FiringApparatus 27
5.4 Pressure and Temperature Controls 27
5.5 Water Level Controls 28
5.6 Maintenance of Low Water Cut-Off Devices 28