EasyManua.ls Logo

Eaton 9395 - Figure 5-9. J1, J2, J3, and J4 15-Pin D-Sub Connectors

Eaton 9395
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLING OPTIONS AND ACCESSORIES
Eaton 9395 UPS (225–275 kVA) Installation and Operation Manual S 164201683 Rev 3 www.eaton.com/powerquality
5-12
10. If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
Secure with the retained hardware.
11. If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
secure with the retained hardware.
12. Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup
instructions.
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
13. Contact an Eaton service representative for verification and testing of the RIM II
and its connections prior to making connections with J1 through J4 (see
Table 5‐6 and Figure 5‐9).
You can order interface cables separately for connecting to the 15‐Pin D‐Sub
Connectors.
Table 5‐6. J1 through J4 Interface Connectors
Status J1 through J4 Description
UPS AVAILABLE Pins 1 and 12 Contacts are closed when the UPS is operating in Online mode
or ready to supply the load.
UPS OFFLINE Pins 3 and 13 Contacts are open when the UPS is offline. Contacts are closed
when the UPS is operating in Online mode.
BATTERY WEAK Pins 5 and 14 Contacts are closed when approximately two minutes of battery
time remains before the critical load is lost.
UTILITY FAILURE Pins 6 and 15 Contacts are closed when Utility Failure is detected.
15-Pin D‐Sub
Connectors
Figure 5‐9. J1, J2, J3, and J4 15-Pin D-Sub Connectors

Table of Contents

Related product manuals