Eaton Corporation
Electrical Group
1000 Cher rington Parkway
Moon Township, PA 15108
United St ates
877-ETN-CARE (877 -386-2273)
Eaton.com
© 2011 Eaton Corporation
All Rights R eserved
Printed in US A
Publication No. IL29C204I / TBG0 00694
Part No. 6634C87H09
1102 rebotcO
Eaton is a registered trademark of Eaton
Corporation.
All other trademarks are property of their
respective owners.
Instruction Leaflet IL29C204I
Installation Instructions for Motor Operator for
3- and 4-Pole ND, NB, NC, MD, MA, MC Type
Circuit Breakers and Molded Case Switches
The instructions for inst allation, testing , maintenance, or repair
herein are provided for the use of the product in general commercial
applications and may not be appropriate for use in nuclear applica-
to replace, amend, or supplement these instructions to qualify them
for use with the product in saf ety-related applications in a nuclear
facility.
This Instr uction B ooklet is published solely for information purposes
and should not be considered all-inclusive. If further information is
required, you should consult an authorized Eaton sales represent a-
tive.
The sale of the product shown in this literature
is subject to the
terms and conditions outlined in appropriate Eaton selling policies
or other contract ual agreement between the parties. This literature
is not intended to and does not enlarge or add to any suc h contract.
The sole source governing the rights and remedies of any purchaser
of this equipment is the contract between the purchaser and Eaton.
NO WARRANTIES, EXPRESSE
D OR IMPLIED , INCLUDING
WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR
MERCHANTABILITY, OR WARRANTIES ARISING FR OM COUR SE
OF DEALING OR USA GE OF TRADE, ARE MADE REGARDING
THE INFORMA TION, RECOMMEND ATIONS, AND DESCRIPTIONS
CONTAINED HEREIN.
In no event will Eaton be responsible to the purchaser or user in
contract, in tort (including negligence), strict liability or other wise
for any special, indirect, incidental or consequential damage or loss
whatsoever, including but not limited to damage or loss of use of
equipment, plant or power system, cost of capital, loss of power,
additional expenses in the use of existing power facilities, or claims
against the purchaser or user by
its customers resulting from the
use of the information, recommendation
s and description contained
herein.
Eective October 2011