EasyManua.ls Logo

Eaton FerrUPS FE - Page 72

Eaton FerrUPS FE
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PHASE CHECK
Eaton FERRUPS FE/QFE UPS (500 VA–18 kVA) Installation Guide S 164201403 Rev B
www.eaton.com/powerquality
68
5. If your UPS has a DC switch, turn on the switch according to the
UPS model:
500 VA–3.1 kVA: Most units do not have a DC switch on the UPS
or external battery cabinet(s). If the external battery cabinet has a
DC switch, turn the switch to the ON position.
4.3–7 kVA: If you have an external battery cabinet(s) with a DC
switch, turn the switch to the ON position.
If you do not have an external battery cabinet(s): unlock the UPS
front cover using the FERRUPS key and remove the front cover.
Locate the DC switch behind the UPS front cover. If there is a
precharge button next to the switch, press it for a few seconds.
Turn the DC switch to the ON position and reinstall the UPS front
cover.
10–18 kVA: If you have an external battery cabinet(s) with a DC
switch, turn the switch to the ON position.
6. 500 VA–3.1 kVA: Turn the UPS ON/OFF switch to the ON position.
4.3–18 kVA: Use the FERRUPS key to turn the UPS ON/OFF
switch to the ON position.
7. The load should still be disconnected at this time.
After a short startup test, the READY indicator blinks for a few
seconds and then remains illuminated. The UPS is ready to supply
output power.
8. Turn the bypass switch to the UPS position.

Related product manuals