EasyManua.ls Logo

EAW KF760 - Page 14

EAW KF760
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 13 of 29
3. Push the KF761 pallet out of the way.
4. While aligning the KF761 with the flown array, bring in the flown enclosures to within 1 of front top of
the palleted KF761 enclosure.
5. Remove the two short connecting pins stored in the KF761 front Hinge Tubes. Slide up the two front
hinges of the KF761 into bottommost flown enclosure and temporarily pin the hinges in this up position
using the top hole of the KF761 s front Hinge Tubes.
NOTE: This aligns the KF761 with the flown enclosure above it for the next step.
All manuals and user guides at all-guides.com

Other manuals for EAW KF760

Related product manuals