EasyManua.ls Logo

EAW KF760 - Page 6

EAW KF760
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 5 of 29
1. Bring in the first pallet of four KF760s and position it under the chain motors.
2. Lower the chain motors for attachment ot the Fly-Bar Hoist Rings.
3. If the Fly-Bar was transported attached to palleted KF760s then attach the chain motors to the Fly-Bar
and skip the next steps.
4. If the Fly-Bar was transported un-attached from a KF760 pallet then attach the chain motors to the
assembled Fly-Bar and perform the next two steps (not shown):
1. Land the Fly-Bar on top enclosures so the weight is off the chain motors.
All manuals and user guides at all-guides.com
all-guides.com

Other manuals for EAW KF760

Related product manuals