EasyManua.ls Logo

EBA 550LT - Installation; Machine Setup and Alignment; Connecting to Power

EBA 550LT
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 10 -
EBA 550 EBA 550 LT
A
A
B
A
The machine is mobile on castors. Align the
machine as followes:
Align machine with water level and adjust
accordingliy.
4 x screws size 19 (A).
Reference area machine table (B).
The machine is delivered ready for operation.
Side tables (A), left and right are available as
an option. Assembly instructions are included.
Plug into socket.
Installation

Related product manuals