EasyManua.ls Logo

ECH2O Tec. 1000-BHL- 2 User Manual

Default Icon
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BEACH HOUSE SERIES
(VERTICAL SYSTEM)
1000-BHL- 2 / 1300-BHL- 3 / 1800-BHL- 4
OWNERS MANUAL
PAGE
2 INTRODUCTION
3 SPECIFICATIONS
4 STANDARD SYSTEM FEATURES
5-6 INSTALLATION INSTRUCTIONS
7-8 OPERATION INSTRUCTIONS
9 MEMBRANE CLEANING PROCEDURE
10 MAINTENANCE TIMETABLE
11 PRESSURE VESSEL ENDPLUG CHANGING PROCEDURE
12 ELECTRICAL DIAGRAM
13 TROUBLESHOOTING GUIDE
14-15 HIGH PRESSURE PUMP REPAIR INSTRUCTIONS
16-17 LIMITED WARRANTY
TM
E
EE
E
C
CC
C
H
HH
H
2
22
2
O Tec.
O Tec.O Tec.
O Tec.
Watermakers
Question and Answer IconNeed help?

Do you have a question about the ECH2O Tec. 1000-BHL- 2 and is the answer not in the manual?

ECH2O Tec. 1000-BHL- 2 Specifications

General IconGeneral
BrandECH2O Tec.
Model1000-BHL- 2
CategoryWater System
LanguageEnglish

Summary

INTRODUCTION

SPECIFICATIONS

STANDARD SYSTEM FEATURES

Instruments

Lists pressure gauges, flow meter, and conductivity meter for system monitoring.

Automatic emergency shut off functions

Details safety features including low pressure, high pressure, and tank full switches.

INSTALLATION INSTRUCTIONS

FRESH WATER FLUSH FILTER

Instructions for installing the fresh water flush filter housing and connecting it.

SEAWATER FEED PUMP AND PRIMING RESERVOIR

Guidelines for mounting and connecting the optional feed pump and priming reservoir.

PRODUCT WATER TUBING

Routing of product water tubing to storage tanks or test stations.

REJECT WATER TUBING/HOSE

Connecting the reject water hose for proper brine disposal.

SYSTEM OPERATION INSTRUCTIONS

SYSTEM SHUT DOWN PROCEDURE

Steps to safely shut down the watermaker system.

FRESH WATER FLUSH PROCEDURE

Procedure for flushing the watermaker with fresh water after use or for short-term storage.

MEMBRANE STORAGE PROCEDURE

Steps to preserve RO membranes for long-term storage up to ten months.

MEMBRANE CLEANING PROCEDURE

MAINTENANCE TIMETABLE

PRESSURE VESSEL END PLUG CHANGING PROCEDURE

ELECTRICAL DIAGRAM

HIGH PRESSURE PUMP SYSTEM TROUBLESHOOTING GUIDE

HIGH PRESSURE PUMP REPAIR INSTRUCTION

ASSEMBLY - DISASSEMBLY OF THE PUMP HEAD

Steps for disassembling and assembling the pump head.

INSPECTION INLET/OUTLET VALVES

Procedure for inspecting and replacing pump inlet/outlet valves and O-rings.

REPLACING PACKING AND RECOVERY SEALS

Instructions for replacing packing and recovery seals in the pump.

REPLACING THE PISTONS

Steps for removing, checking, and replacing pump pistons.

REPLACING OIL SEALS

Procedure for replacing oil seals and O-rings in the pump.

CRANK MECHAISM MAINTENANCE

Maintenance steps for the pump's crank mechanism.

ECHO TEC. WATERMAKER LIMITED WARRANTY

Related product manuals