Do you have a question about the Echo 99944100026 and is the answer not in the manual?
Position clamps onto the straight pipe sections as the initial step in the installation process.
Connect the elbow pipes (A) and straight pipes (B) together according to the provided diagram.
Loosely secure clamp (D) first, then fully secure clamp (C) to the assembled pipe sections.
Attach the appropriate adapter (small or large) to the blower unit's pipe for connection.
Initiate the operation of the blower unit before proceeding with cleaning.
Place the pipe assembly in the rain gutter, tilting it 10 degrees away and angling the elbow 30-45 degrees.
Move the pipe assembly along the rain gutter lip, lifting it over any support brackets.