EasyManua.ls Logo

EcoFlow Alternator - Page 6

EcoFlow Alternator
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Steps
1. Use the installation board to locate the drilling positions and mark them with a marker.
2. Drill 2 holes of 5 mm diameter.
3. Fix the installation board to the back of the charger with three M5 screws.
4. Insert the self-tapping screws through the installation board and into the holes.

Related product manuals