EasyManua.ls Logo

Ecolab ES-2000HT INTL - Frame & Tub Assemblies

Ecolab ES-2000HT INTL
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ES-2000HT INTL Installation & Operation Manual 7610-003-24-90
Issued: 07-10-2006 Revised: N/A
SECTION 6: PARTS SECTION
TUB & FRAME ASSEMBLIES
35
Strainer, Accumulator Weldment
05700-031-33-13
Accumulator Weldment
05700-002-19-05
Frame Weldment
05700-002-08-34
Brace, Lower Frame Weldment
05700-002-12-72
Brace, Frame Weldment
05700-002-14-62
Bullet Feet
05340-108-01-03
Tub Weldment
05700-002-08-99
*Bulkhead Fitting, 45 1/2” Hose Barb, S/S
04730-002-69-80
Gasket, Tub Drain
05330-002-10-56
Refer to Motor & Pump
Assembly Page
* Represents an item not shown.
Plug, Rear Corner
05700-002-25-01
Plug, Front Corner
05700-002-25-00
Hose, 3/8" I.D. x 5/8" O.D. x 14" Long
05700-002-04-40
Clamp, Mini 7/16" - 25/32"
04730-011-36-05
Elbow, 90° 3/8" x 1/8"
04730-002-18-96

Related product manuals