31
English (EN)
5. Transportation & installation
5.1. Transportation
•
tipping during transport.
•
•
•
of water to avoid damage.
5.2. Installation preparations
•
•
•
•
•
the unit.
5.3. Mounting Instructions
•
•
•
5.4. Electrical installation
ings.
5.4.1. Power supply
The phase order is subordinated.
5.4.2. Earth leakage circuit breaker (ELCB).
•
phase 400V.
•
•
due to earth leakage.
5.4.3. Service switch
BF4 BF8
Fre
5.5 kW 11 kW
14.2 A 27 A
20 A 32 A