EasyManua.ls Logo

EcoLet 25e - Installation

EcoLet 25e
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Instructions
1. Position the unit on a level surface leaving enough space in front of the unit to remove the
compost tray.
Minimum distance from the back wall to the front of the tray is 1100mm.
Keep in mind you will need a 240V power point available somewhere near the unit.
Be mindful of how the vent is to be installed as this may impact windows, etc.
2. Install the vent pipe either straight up through the ceiling or out through the wall and up
the exterior of the building.
An optional vent wall kit is available.
Donotusebendsover45˚.
3. Installtheroofashingandsealasrequired.
4. Insulate all parts of the vent pipe in roof cavities or outside the building using the insulation
provided and shield with 100mm pipe provided. Note: You may need to source extra
insulation.
5. Fit the insect netting cap to the top of the vent.
Installation
Tools required
SILICONE
DrillMeasuring
tape
Sealant/
adhesives
Saw Ladder 55mm Hole saw
or Jigsaw
Fit insect netting
onto reducing
coupling
Must be insulated