23
en
Prior to commissioning
Prior to commissioning, it's important to ensure:
- that the EGO Smart Heater is c or re ctly installed in the water
tank, has been set up in an optimal installation site and is
properly sealed. (see installation site section)
- that the permissible total pressure of the system does not
exceed the permissible pressure of the reservoir and EGO
Smart Heater.
- that the EGO Smart Heater is w ir ed in accordance with the valid
regulations as well as the current instruction and fuse-protected.
(see section on mains connection / safety instr uctions )
- that the control unit of the remote station is correctly connected
to the EGO Smart Heater in accordance with the manufacturer's
specifications and is ready for operation. If unable to
communicate with the remote station, the Smart Heater cannot
transmit power and an error is indicated.
- that the correct protective grounding from the reser-voir and
EGO Smart Heater is ensured and checked.
Commissioning
1. Switch on the mains voltage on the EGO Smart Heater
and the remote station. If the rotary selector on the EGO
Smart Heater is set to OFF, the status indicator does not
light up.
2. Set the rotary selector to the desired max. storage
tempera-ture between 40 and 80°C.
The EGO Smart Heater is now ready for operation. The status
indicator lights up or flashes green. During the initial commissioning,
it is possible that the indicator will remain lit up in red until the remote
station has established a connection with the EGO Smart Heater via
the R S - 485 interface. This process may take several minutes.