This appliance must be fitted in accordance with the following
instructions.
The Local Building Regulations
The Building Regulations
The Building Standards, (Scotland-consolidated) Regulations.
Local water bylaws. British Standards- code
of practice

Heating systems in buildings. Design for water-based heating
systems.

Heating systems in buildings. Method for calculation of the design
heat load

Heating systems in buildings. Installation and commissioning of
water based heating systems

Requirements for electrical installations. IEE Wiring Regulations.
Seventeenth edition.

Closed expansion vessels with built-in diaphragm for installation
in water

Materials used in the manufacture of this appliance are non-
hazardous and no special precautions are required when fitting
or servicing this appliance.

 
A load check should be taken into consideration when installing
high output boilers.
 
The boiler must be fitted on a wall that will provide an adequate
fixing, and should be fitted in a location that the boiler and
pipe-work are not subject to frost and damp conditions.
 
Detailed recommendations are given in BS EN 12828, BS 6700
and CP 342-2
Pipes forming part of the useful heating surface should be
insulated to prevent any potential heat loss or frost damage
(BS 6700).
Drain valves should be fitted at the lowest point of the system
pipe work in an accessible position.
Drain valves should be in accordance with BS 2879 and copper
tube to BS EN 1057. is recommended.

The boiler can be installed in almost any location within a domestic
or commercial property, however consideration should be given to
future maintenance. Never leave the boiler switched off if there is
danger of having temperatures below C in the room where it is
located.
We recommend that a minimum clearance of 450 mm should be
allocated for the removal of the front cover and adequate access
to the boiler plumbing and the internal electrical connections.
A 50 mm allowance should be made at either side of the boiler
to allow free flow air into the boiler case and allow access to
screws on the boiler case.

