Do you have a question about the EHC SLIMJIM and is the answer not in the manual?
Detailed steps for cleansing, inhibiting, and flushing the central heating system.
Steps to ensure system fill, pressure, pump mode, and flow are correct for operation.
Assess property load, ensure appliance earthing, and perform safety tests.
Wiring schematic for indirect systems using volt-free boiler control connections.
Wiring schematic for direct systems using volt-free boiler control connections.
Warning against applying voltage to RP connections to prevent irreversible PCB damage.
Interpreting LED indicators for normal operation, status, and fault diagnosis.
Detailed technical data including power ratings, dimensions, electrical load, and safety class.