11
GB-063C_f.615
SYSTEM PROTECTION - COMMISSIONING
14. System protection
Failuretoprotectthesystemwillinvalidatethemanufac-
turer’swarranty.Afterthesystemhasbeeninstalledthe
cleansingandinhibitingproceduremustbecarriedoutas
follows:
Procedure:
1. Fill the system with cold mains water to the recom-
mendedpressure1.5barandcheckforleaks,thendrain
thesystemthoroughlymakingsurealldraincocksare
fullyopenandthatthesystemiscompletelydrained.
2. Add Fernox Heavy Dutyrestorer through theheader
tankorviallingloopattherecommendeddose.One
bottlemustbeusedasaminimumperdwelling.Ifyou
areunsureofthecorrectdoserate,contactFernox.
3. Re-llthesystemandcirculatetheHeavy-DutyRestorer
priortotheboilerbeingredup,thencommissionthe
systeminthenormalway.Thecleansingagentmust
beinthesystemforaminimum1hourwiththesystem
at normal operating temperature.A longer period of
timewouldbemorebenecialtothecleansingprocess
especiallyifexcessuxwasused.
4. Drainandushthesystemthoroughlytoremovethe
cleaningagentandanydebrisorcontaminant.Thisisa
criticalpartofthecleaningprocessandmustbecarried
outcorrectly.Usearinsetestmeter(TDS),suchasthe
FernoxCTM.Thereadingmustbewithin10%ofthe
mainsppmvalue.
5. ThenaddtheFernoxProtector(CopalMB1orSuper
concentrate). This will protect against the formation
ofscale,corrosionandmicrobiologicalgrowths.Itis
crucialhowever,thatfortheprotectortoworkcorrectly,
thesystemmustbeproperlycleansedandushed.
6. ThelabelincludedwithintheFernoxProtectorcarton
shouldbecompletedandattachedadjacenttotheboiler.
7. Werecommendinhibitorlevelsarecheckedonanan-
nualbasis(usuallyduringtheservice)orsoonerifthe
systemcontentislost.Thisshouldbecarriedoutusing
aFernoxinhibitorTestKit.
8. FernoxTechnicalServiceHelplineon08708700362
forfurtherassistance.
IFSUPPLIEDWITHTHEGRUNDFOSSUPM3PUMP
15. Start-up / Commissioning
1. Ensuresystemislledwithwater&vented.
2.
Checkiftheappropriatesysteminstallationpressureis
reached
3. Switchtheboileron&setexternalcontrolstocallfor
heat.
4. Checkthepumpissettothecorrectmode(seetable
below).Todothis,press buttonfornomorethan2
seconds.TheLED’sshouldsignalanoperatingmode
attheplacepointedbyarrow.
5. IftheLEDsaresignalingadifferentoperatingmodethan
recommendedinthetablebelow,settheappropriate
modeaccordingtothefollowinginstructions:press
buttonforlongerthan2seconds,butlessthan10sec-
onds(LED’swillstarttoash),thepumpthenswitches
tothesettingsmode.LEDsglowstoindicatethecur-
rentsettings.To change the settingsofthepumpin
accordancewiththetablebelow,youcansettheright
combinationofglowingLEDsbypressingthe button.
OnceLEDcombinationissetcorrect,bynotpressing
Rated
power
[kW]
Pump lifting
height [m]
LED 1
red
LED 2
yellow
LED 3
yellow
LED 4
yellow
LED 5
yellow
4
4 - 7 5
10 - 12 6
12 - 14 7

If the pump has detected one or more alarms, the bicolored LED
1 switches from green to red. When an alarm is active, the LEDs
indicate the alarm type as defined in the table below. If multiple
alarms are active at the same time, the LEDs only show the error
with the highest priority. The priority is defined by the sequence
of the table. When there is no active alarm anymore, the user in-
terface switches back to operation mode.
 




One red LED + one
yellow LED (LED 5)
Rotor is
blocked.
Trying to start
again every 1,5
seconds
Wait or deblock
the shaft.
One red LED + one
yellow LED (LED 4)
Supply volt-
age too low
Only warning
pump runs
Control the sup-
ply voltage
One red LED + one
yellow LED (LED 3)
Electrical
error
Pump is stopped
because of low
supply voltage or
serious failure
Control the supply
voltage /Exchange
the pump
LED
1
2
3
4
5
LED
thebuttonfor10secondsthepumpwillremember
buttonfor10secondsthepumpwillrememberthisset-
tingandwillexitfromsettingmodebacktoperformance
view.
Note: holding
button for more than 10 seconds
will enter the pump into key lock mode. This pre-
vents the user from altering the pump settings. To
remove the key lock the pump settings and allow
the pump settings to be changed, hold button
again for more than 10 seconds.
6. Ensureadequateowthroughtheboilerisreached.The
pumpshouldselfventafterashortperiodofrunning.
Ifnecessaryassisttheventingprocessinthefollowing
way;Warningthescrewheadinthecentreofthepump
isnotintendedtobeusedtoassistventingofthepump,
Damagetothepumpinternalsmayoccur!
• closetheisolationvalveontheoutlet,
• leaveboilerrunningfor15sec.
• opentheisolationvalve.,
7. Switchtheboileroff.
8. Settheboilertotherequiredsystemtemperature,see
the„Operating”section.