Do you have a question about the EHC Fusion and is the answer not in the manual?
Compliance requirements with local building regulations and British Standards for installation.
Guidelines for selecting a suitable location and mounting the boiler securely on a flat wall.
Instructions for pipe connections, use of isolation valves, and recommendations against ball valves.
Procedures for system cleansing, inhibiting, and protection against scale and corrosion.
Requirements for qualified tradespersons, earthing, and electrical safety checks before operation.