5
GB-063C_f.615
1. Load Check
Aloadcheckmustbetakenintoconsiderationwheninstallinghighpowerboilers.Thiscanbecarriedout
byaqualifiedelectrician.Theremaybearequirementtoupgradethemainincomingfusesupplyingthe
property;thiswilldependontheboileroutputbeinginstalledandexistingelectricalloadrequirementsof
theproperty.
2. Boiler location
Theboilermustbeinstalledontoawallthatwillprovideanadequatefixing.Precautionsmustbetakenif
theboileristobeinstalledinareassubjecttodamporfrostconditions.
3. Central heating (design & installation)
DetailedrecommendationsaregiveninBSEN12828,BS6700:+A1andCP342-2.
Pipesformingpartoftheusefulheatingsurfaceshouldbeinsulatedtopreventanypotentialheatlossor
frostdamage.(BS6700).
Drainvalvesshouldbefittedatthelowestpointofthesystempipeworkinanaccessibleposition.Drain
valvesshouldbeinaccordancewithBS2879andcoppertubetoBSEN1057isrecommended.
PREPERATION
LOCATION
Theboilercanbeinstalledinalmostanylocationwithinadomesticorcommercialproperty;howevercon-
siderationshouldbemadeforfuturemaintenance.Neverleavetheboilerswitchedoffifthereisadangerof
havingtemperaturesbelow0°Cintheroomwhereitislocated,(Anadditionalfroststatmustbeusedifthere
isalikelihoodofthetemperaturefallingbelow0°C).
Werecommendthataminimumclearanceof400mmshouldbeallocatedfortheremovalofthefrontcover
toallowadequateaccesstotheboilersplumbingandtheinternalelectricalconnections.A50mmallowance
shouldbemadeateithersideoftheboilertoallowfreeowairintotheboiler.
!
The boiler must be installed in the upright position; failure to do so will invalidate the Warranty!