6
GB-063C_f.615
GENERAL
1. General
Theboilermustbeinstalledbyaprofessionalplumberorheatingengineerandmustbeconnectedto
thepubliclowvoltagenetworkbyacompetentperson.Werecommendthisisinstalledbya17thEdition
certiedElectrician.
The Electric Heating Company Ltd will not be held responsible for any faulty installations which
are performed by un-qualified tradespersons.
2. Pipe Connections
SlimJimElectricBoilershave22mmcompressionconnectionsattheboiler’sowandreturnpipes.Please
notethattheboilersaresuppliedwithblankingplugsfortransitpurposes.Thesemustberemovedbefore
connectionstoexternalpipescanbemade.
The Flow Outlet (TopRedConnection)andReturnInlet(BottomBlueConnection)areclearlymarked
withintheboilercase.Under nocircumstancesshouldtheseconnections bereversed. HotSoldered
Jointsshouldnotbemadeasadirectconnectiontotheboiler,Compressionjointsshouldused.
3. Case Removal
Inordertotakeoffthefrontcover,undothexingscrewsatthetopandbottomoftheunitandpullthe
covertowardyou,Careshouldbetakennottodamagethefrontcontroller.
4. Isolation Valves
Werecommendthatlock-shieldisolationvalvesarettedontheFlowandReturnpipe-work.Suchvalves
mustbefullboreandnot“ballvalves”.Theinstallationof“ballvalves”intheowandreturnpipe-work
willreducetherecommendedowratesthroughtheboiler.
!
Care must be made when installing the isolation valves that the PRV and expansion positions
are not impaired.
5. Auto air vents
Anautoairventmustbettedtotheexternalpipeworkwheninstalledinanunventedsystem.
!
Do not install AAV’s directly above the SlimJim boilers. AAV’s should be installed to either the
top left or right hand side of the boilers. (This is to prevent any water entering the boiler in the event
of an AAV leaking).
6. Boiler Sizing
Calculatethe“SpaceHeating”requirementsinaccordancewithBSEN12831andBSEN14336.Ifthe
boileristoheatthedomestichotwater,anadditionalallowanceof3kW(10,239Btu’s)shouldbemade
tothe“Spaceheating”calculationtodeterminethecorrectboileroutput.
7. Insulation
Wherepractical,andifpossible,werecommendthatallpipe-workisinsulated,inparticulartheprimary
pipe-workwithinaboilercupboard.Thisistoreduceheatlossandreducehighcupboardtemperatures
fromexposedpipe-work.(BS6700+A1).
8. System Design
AstheSlimJimboilersareoflowwatercontentanopencircuitmustbeachievedincorporatingapprox2
metresofcontinuous22mmpipeworkaftertheboilerconnectionsandbeforeanyzonevalves.(SPlan)
Wealsorecommendthatamagneticlterisusedandinstalledintothereturnpipeworkofthesystem
beforethepumpaspertheschematiconpage10.Provisionshouldbemadetoallowtheltertobe
cleanedwithoutdrainingthefullheatingsystem.