6
GB-063C_f.615
GENERAL
1. General
Theboilermustbeinstalledbyaprofessionalplumberorheatingengineerandmustbeconnectedto
thepubliclowvoltagenetworkbyacompetentperson.Werecommendthisisinstalledbya17thEdition
certiedElectrician.
The Electric Heating Company Ltd will not be held responsible for any faulty installations which
are performed by un-qualified tradespersons.
2. Pipe Connections
SlimJimElectricBoilershave22mmcompressionconnectionsattheboiler’sowandreturnpipes.Please
notethattheboilersaresuppliedwithblankingplugsfortransitpurposes.Thesemustberemovedbefore
connectionstoexternalpipescanbemade.
The Flow Outlet (TopRedConnection)andReturnInlet(BottomBlueConnection)areclearlymarked
withintheboilercase.Under nocircumstancesshouldtheseconnections bereversed. HotSoldered
Jointsshouldnotbemadeasadirectconnectiontotheboiler,Compressionjointsshouldused.
3. Case Removal
Inordertotakeoffthefrontcover,undothexingscrewsatthetopandbottomoftheunitandpullthe
covertowardyou,Careshouldbetakennottodamagethefrontcontroller.
4. Isolation Valves
Werecommendthatlock-shieldisolationvalvesarettedontheFlowandReturnpipe-work.Suchvalves
mustbefullboreandnot“ballvalves”.Theinstallationof“ballvalves”intheowandreturnpipe-work
willreducetherecommendedowratesthroughtheboiler.
!
Care must be made when installing the isolation valves that the PRV and expansion positions
are not impaired.
5. Auto air vents
Anautoairventmustbettedtotheexternalpipeworkwheninstalledinanunventedsystem.
!
Do not install AAV’s directly above the SlimJim boilers. AAV’s should be installed to either the
top left or right hand side of the boilers. (This is to prevent any water entering the boiler in the event
of an AAV leaking).
6. Boiler Sizing
Calculatethe“SpaceHeating”requirementsinaccordancewithBSEN12831andBSEN14336.Ifthe
boileristoheatthedomestichotwater,anadditionalallowanceof3kW(10,239Btu’s)shouldbemade
tothe“Spaceheating”calculationtodeterminethecorrectboileroutput.
7. Insulation
Wherepractical,andifpossible,werecommendthatallpipe-workisinsulated,inparticulartheprimary
pipe-workwithinaboilercupboard.Thisistoreduceheatlossandreducehighcupboardtemperatures
fromexposedpipe-work.(BS6700+A1).
8. System Design
AstheSlimJimboilersareoflowwatercontentanopencircuitmustbeachievedincorporatingapprox2
metresofcontinuous22mmpipeworkaftertheboilerconnectionsandbeforeanyzonevalves.(SPlan)
Wealsorecommendthatamagneticlterisusedandinstalledintothereturnpipeworkofthesystem
beforethepumpaspertheschematiconpage10.Provisionshouldbemadetoallowtheltertobe
cleanedwithoutdrainingthefullheatingsystem.