EasyManuals Logo

EINHELL GH-BC 33-4 S User Manual

EINHELL GH-BC 33-4 S
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
GB
- 31 -
Putting the equipment back into operation
1. Remove the spark plug (see section 9.4).
2. Clean the spark plug and check that the
electrode gap is correct, or insert a new spark
plug with the correct electrode gap.
10.3 Transport
To transport the machine, empty the petrol tank
as described in section 10. Clean coarse dirt o
the equipment with a brush or hand brush. Dis-
mantle the drive rod mechanism as described in
section 5.1.2.
10.4 Ordering spare parts
Please provide the following information on all
orders for spare parts:
Model/type of the equipment
Article number of the equipment
ID number of the equipment
Part number of the required spare part
11. Disposal and recycling
The equipment is supplied in packaging to pre-
vent it from being damaged in transit. The raw
materials in this packaging can be reused or
recycled. The equipment and its accessories are
made of various types of material, such as metal
and plastic. Defective components must be dispo-
sed of as special waste. Ask your dealer or your
local council.
Anl_SA_GH_BC_33_4_S_SPK8.indb 31Anl_SA_GH_BC_33_4_S_SPK8.indb 31 11.05.16 09:0211.05.16 09:02

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EINHELL GH-BC 33-4 S and is the answer not in the manual?

EINHELL GH-BC 33-4 S Specifications

General IconGeneral
Power sourceGasoline
Line diameter2.5 mm
Product colorBlack, Red
Rotational speed7500 RPM
Secondary handleYes
Line length supplied4 m
Cutting diameter (max)255 mm
Weight and Dimensions IconWeight and Dimensions
Weight9000 g

Related product manuals