EasyManua.ls Logo

EINHELL HGG 110 - Page 13

EINHELL HGG 110
84 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HGG 110
HGG 110 Niro
HGG 171 Niro HGG 300 Niro
Nominal heat load Qu: max. (Hi) 11,2 kW max. (Hi) 17 kW max. (Hi) 30 kW
Air throughput: 500 m
3
/h 500 m
3
/h 500 m
3
/h
Connection: G 30: 815 g/h G 30: 1430g/h G 31: 2150 g/h
Equipment category:
I3B/P I3B/P I3P
Country of destination
DE, AT, CH, PT, ES,
SE, IT, DK, NO, FI, FR,
GB, CZ, HU, BE, PL,
BG
DE, AT, CH, PT, ES,
SE, IT, DK, NO, FI, FR,
GB, CZ, HU, BE, PL,
BG
DE, AT, CH, PT, ES,
SE, IT, DK, NO, FI, FR,
GB, CZ, HU, BE, PL,
BG
Type of gas: commercially
available propane
(DIN 51622)
commercially
available butane
(DIN 51622)
commercially available
propane (DIN 51622)
commercially available
butane (DIN 51622)
commercially available
propane (DIN 51622)
Operating pressure P: 300 mbar
(Propan/Butan)
300 mbar
(Propan/Butan)
1500 mbar (Propan)
Power supply: 230 V ~ 50 Hz, 0,17 A,
38 W, IP 44
230 V ~ 50 Hz, 0,17 A,
38 W, IP 44
230 V ~ 50 Hz, 0,17 A,
38 W, IP 44
Air temperature class:
57°C 75°C 76°C
8. Technical Data
13
GB
Anleitung_HGG_110_171_300_SPK7:_ 19.07.2011 11:30 Uhr Seite 13

Related product manuals