EasyManua.ls Logo

EKKO EB12E Series - 3. Commissioning, transport, outage; 3.1 Test; 3.2 lifting; transport. Transport

EKKO EB12E Series
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 7 -
- 7 -
- 7 -
3.Commissioning, transport, outage
3.1 Test
Re commissioning on receipt of our new car pile high or needs, please in the (first) the
following steps before operation vehicle: The final installation and charging a battery (see
Chapter sixth) Work according to the inspection and routine inspection machine function.
3.2 lifting / transport. Transport
When transport, the removal of the goods, the fork fell to the lowest position, and according
to the following chart security fixed special lifting equipment.
Lifting:
Please use the special cranes and lifting equipment;
Please don't stand under the shaking of the goods;
Please do not into the danger zone when lifting
Safe parking vehicles and according to the lifting point is shown in figure 5 tie car body.
Fig. 5: Used crane hoisting

Other manuals for EKKO EB12E Series

Related product manuals