WINTERIZING
IMPORTANT
Improper winter lay up is a major cause of failure
due to freezing or buildup.
Steps
1. Flush toilet and activate electro scan several times to
clean out hoses and tank.
2. Turn off water supply and flush toilet as dry as possible.
NOTE: Check toilet manufacturer's instructions to
ensure no damage is done to any components.
3. Turn off power and disconnect wires to electro scan.
4. Close seacocks.
5. Slowly open cross-over plug.
Caution: Open plug slowly as unit may be under pressure.
5. Using a pump and 3/8" tube, remove water from each
side of partition in treatment tank through crossover
plug.
6. Disconnect and drain hoses.
Recommissioning & Start-Up
1. Reconnect hoses and open seacocks.
2. Reconnect wires and turn power on.
NOTE: electro scan treatment tank must be full with sea
water salinity water before activating a cycle.
3. Flush toilet using one of the following methods to fill
the treatment tank with salt water.
Scroll to Flushtime (1 or 2) screen using < or >
keys when unit is not in cycle. Hold "mode" button
and press < or > key. Toilet will flush for set time.
Separate operation - flush toilet allowing three
gallons of water to pass into electro scan.
if toilet operates electro scan - you must disconnect
power from electro scan while flushing to allow
three gallons (13.6 liters) of water to pass into
electro scan.
NOTE: In fresh and brackish water operation, salt content
of treatment tank must be ocean water salinity prior
to using unit for treatment. Ocean water salinity is
3% or approximately four ounces of salt to one
gallon of water (32g/liter).
4. Inspect all connections for leaks.
5. System is ready for use.
Cross-over Plug