EasyManua.ls Logo

Element4 Sky - Gravel Arrangements; Commissioning the Appliance

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
INSTALLER INFORMATION
Commissioning the appliance
A soundness test MUST be made before the
installed stove is left with the customer.
Ensure that the re is burning at full rate for a
minimum of 5 minutes to warm the ue.
If there are problems, the ue may require
attention.
The stove will produce an odour and/or smoke
for the rst few hours of use. Please ventilate
the room. Also please note that during this initial
burning period, a grey dust deposit will be formed
on the inside of the window, please clean this
before leaving the appliance with the customer.
Gravel Arrangements / Blackstones /
Brilliants
Ensure that the Grate , is sitting rmly in the base
of the re box, with the long slot in the centre of the
Grate aligning with the centre slots on the Burner
Tube. The Pilot ame must be visible through the
grate and the cut-out in the Pilot Shield.
Scatter evenly the Gravel over the top of the Grate
and Burner. Make sure that some holes of grate
are still visible. Ensure that none of the gravel
enters the pilot enclosure.
The Gravel arrangement is now complete, How-
ever, it is important to check that no stones
have entered the pilot area and the cross
lighting is good before the glass is replaced.
Gravel Arrangement

Other manuals for Element4 Sky

Related product manuals