Contents
General Information 4
1.1 Description 4
1.2 Specifications 10
Installation 13
2.1 Unpacking 13
2.2 Procedures before installation 13
2.3 Installation of the Pipe Section 14
2.4 Separate mounting of Pipe Section and Control Unit 15
2.5 Installation and changing of the Control Unit 17
2.6 Pressure drop 19
2.7 Electrical installation 21
Operation 23
3.1 Principle of operation, DP-Flow Measurement 23
3.2 Change of Flow Range 23
3.3 Change of Flow Direction 25
3.4 Adjustment of switch point 26
Trouble shooting 27
4.1 Verification of flow 27
4.2 Electrical connections 29
4.3 Spares 29
Tables 30
5.1 Measuring ranges 30
5.2 Weight and dimensions 31
Spare parts 33
6.1 Exploded drawing V-GL/FA 33
6.2 Exploded drawing V-GSS/FSS 35
6.3 Exploded drawing VSS-GSS/FSS 37
Distributors 38
Recycling 38