2. Next, carefully unfold the extra support leg behind the leg and attach it securely using a knob screw (C). Then repeat
steps 3 and 4 on the previous procedure.
Height adjustable frame feature
The Yard Master Plus allows for the main frame to be set at various height settings at 5.9” intervals.
Step 1: Lay the frame on a clean sheet to avoid damaging the projection surface. Then lay the legs over on the back of the
frame in the position desired.
Step 2: Once you have aligned the leg’s holes with the frame’s holes, secure with the knob screws.
Screen Disassembly
1. After using the screen, disassemble and store it in the carrying bag (F). To disassemble the screen, follow the
assembly procedure in reverse order.
2. Store the screen in the provided carrying bag (F). Be sure to place folding frame, legs, and smaller parts into the
carrying bag first and place the material on top to keep material from creasing or tearing.