EasyManua.ls Logo

Elson 150zd - Commissioning Procedures; Filling the Unit with Water; System Checks and Verification; Direct Unit Commissioning Steps

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
FILLINGTHEUNITWITHWATER
Ensurethatallttingsandimmersionheatersare
correctlyttedandtightened.Animmersionheaterkey
is provided to aid tightening the immersion heater(s)
Checkexpansionvesselpre-chargepressure•
Thevesselissuppliedprechargedto0.35MPa
(3.5bar)tomatchthecontrolpressureof
thepressurereducingvalve.Theprecharge
pressureischeckedusingacartyregaugeby
unscrewing the plastic cap opposite the water
connection.
Checkallconnectionsfortightnessincludingthe•
immersionheater(s).Animmersionheaterkey
spannerissuppliedforthispurpose.
EnsurethedraincockisCLOSED.•
Openahottapfurthestfromthecylinder.•
Openthemainsstopcocktolltheunit.When•
waterowsfromthetap,allowtorunforafew
minutestothoroughlyushthroughanyresidue,
dirtorswarf,thenclosethetap.
Open successive hot taps to purge the system •
ofair.
SYSTEMCHECKS
Checkallwaterconnectionsforleaksandrectify•
asnecessary.
Turnoffmainswatersupply.•
Removethepressurereducingvalveheadwork•
toaccessthestrainermesh,cleanandre-t.
Manuallyopen,forafewseconds,eachrelief•
valveinturn,checkingthatwaterisdischarged
andrunsfreelythroughthetundishandoutat
thedischargepoint.
Ensurethatthevalve(s)reseatsatisfactorily.•
DIRECTUNITS
Switchonelectricalsupplytotheimmersion
heater(s) and allow the cylinder to heat up to
normalworkingtemperature(60°Crecommended,
approximatelygraduation4onthethermostat).
Ifnecessarythetemperaturecanbeadjustedby
insertingaatbladedscrewdriverintheadjustment
knobontopoftheimmersionheaterthermostatand
rotating.Theadjustmentrange1to5represents
atemperaturerangeof12°Cto68°C.Check
theoperationofthermostat(s)andthatnowater
hasissuedfromtheexpansionreliefvalveor
temperature/pressurereliefvalveduringtheheating
cycle.
INDIRECTUNITS
Filltheindirect(primary)circuitfollowingtheboiler
manufacturer’scommissioninginstructions.Toensure
thecylinderprimaryheatexchangerislled,the2
portmotorisedvalve(supplied)shouldbemanually
openedbymovingtheleveronthemotorhousingto
theMANUALsetting.Whentheprimarycircuitisfull
returnthelevertotheAUTOMATICposition.
Switchontheboiler,ensuretheprogrammeris
settoDomesticHotWaterandallowthecylinder
toheatuptoanormalworkingtemperature(60
o
C
recommended,approximatelygraduation4onthe
thermostat).Ifnecessarythetemperaturecanbe
adjustedbyinsertingaatbladedscrewdriverin
theadjustmentknobandrotating.Theminimum
thermostatsettingis12°C.
Theadjustmentrange1to5representsa
temperaturerangeof12°Cto68°C.
Checktheoperationoftheindirectthermostatand
2 port motorised valve and that no water has issued
fromtheexpansionreliefvalveortemperature/
pressurereliefvalveduringtheheatingcycle.
BENCHMARKLOGBOOK
Oncompletionoftheinstallationandcommissioning
proceduresdetailedinthismanualtheBenchmark
“Installation,CommissioningandServiceRecordLog,
pages22and23shouldbecompletedandsignedoff
bythecompetentinstallerorcommissioningengineer
intherelevantsections.Thevarioussystemfeatures,
locationofsystemcontrols,userinstructionsand
whattodointheeventofasystemfailureshouldbe
explainedtothecustomer.Thecustomershouldthen
countersigntheBenchmark
TM
commissioningchecklist
(page22)toacceptcompletion.TheServiceRecord
shouldbelledinwhenanysubsequentserviceor
maintenanceoperationiscarriedoutontheproduct.
COMMISSIONING

Related product manuals