Operation and Maintenance
UFM Series 6
Q.Sonic-plus
5.6.3 FM Certified 24
5.6.4 CSA Certified 25
5.7 Sealing 26
5.7.1 Main Plate 26
5.7.2 SPU 26
6 Installation and Commissioning 29
6.1 Introduction 29
6.2 Flow Cell Installation Requirements 29
6.2.1 Installing a Meter in the Pipeline 29
6.2.2 Testing Installation 30
6.3 Wiring Instructions 31
6.4 SPU Configuration 31
6.5 Cold Commissioning 31
6.6 Hot Commissioning 32
7 Operation 33
7.1 LED at Display 33
7.2 Front Panel and Touch Display 35
7.3 Basic Display 36
7.4 Home Screen 37
7.5 Diagnostics 42
7.6 Info 48
8 Maintenance 50
8.1 Collecting Data 50
8.2 Inspection of Measured Data 50
8.2.1 Sample Rate 50
8.2.2 Performance 51
8.2.3 Velocity of Sound 51
8.2.4 Gas Velocity (Zero Flow Measurement) 51