8
OPERATION DESCRIPTION
3.1 INSTALLMENT
1) Apart all the wooden package. Avoid damaging the machine.
2) Move the machine to an installment position by fork lift.
3) Install master cover and tighten screws on both side.
4) Lift up the tower.
5) Fix and tighten the tower by M8 screws. Total 6 screws on each side.
6) Connect the sensor wires.
Proximity Switch: “―”& 4.
7) Install the motor cover and support brackets.
Total 4 screws required.
Connect the power cable with the socket by a 110V/230V power.