EasyManuals Logo
Home>Emerson>Desktop>ControlWave Series

Emerson ControlWave Series User Manual

Emerson ControlWave Series
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Emerson FB2200 Flow Computer Instruction Manual
D301784X012
March 2019
36 Installation
Figure 2-22. DC Power Connections
1
To external DC power supply
Connecting Battery Power
DANGER
EXPLOSION HAZARD: Never remove end cap(s) in a hazardous location. Removing end cap(s) in a
hazardous location could result in an explosion.
When power comes from an internal battery pack, the battery pack plugs into one of two pairs of
connectors.
2.10.2.1 Installing the Main Battery Pack
If you purchased one of the battery/solar panel options, you need to install the main battery pack
before you place the device in service.
The device provides a battery cable with two pairs of battery connectors, enabling you to hot-swap
the battery pack in a non-hazardous location. You can use either pair of connectors when you
install the battery.
1.
Remove the battery pack from its packaging.
2.
Remove the plastic tabs covering the connectors on the battery pack.

Table of Contents

Other manuals for Emerson ControlWave Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson ControlWave Series and is the answer not in the manual?

Emerson ControlWave Series Specifications

General IconGeneral
BrandEmerson
ModelControlWave Series
CategoryDesktop
LanguageEnglish

Related product manuals