2
YARWAY WELBOND VALVES
INSTRUCTION GUIDE
NOTE
Please keep the following recommendations in mind,
while removing the components from the valve:
• Hold the valve fixed on a solid structure (e.g. base,
bench, piping), while taking all applicable safety
precautions.
• Carefully remove “Tack Weld” with an
appropriatetool.
• De-pressurize the pipeline before performing any
in-line repair.
# Component Description Action
8 Yoke Bushing Remove
10 Handwheel Remove
11 Locknut Remove
23 Washer Remove
FIGURE 1
Sectional View of Welbond Valve Assembly (with the components that should be removed)
OVERVIEW OF THE VALVE COMPONENTS
THAT SHOULD BE REMOVED