Issue%1% % % % % ENKI®%
WWW.HOUSEOFENKI.COM
!
INSTALLATION
(See diagram)
§ Prepare the supply pipes ensuring the pipework is parallel and set at 45mm centres.
§ The pipework must be flushed prior to installation.
§ After flushing the pipework, install the mixer as a standard exposed fitting, with the outlet
facing downwards.
§ The hot supply pipe must be connected to the hot inlet of the mixer, indicated by the red dot.
§ Place the trim plate and seals over the brass tails.
§ Offer the valve to the wall and place the tails through the holes in the wall.
§ From the rear connect the back nuts and tighten up to the rear, ensuring the valve is vertical.
§ Secure the valve into position and connect to the water supply pipes, ensuring a good watertight
seal is created.
§ Once secured and connected, turn on water supply and check for leaks.