9
RAK111_ENG / © Ensto 2019
5. Mounting instructions
5.1. Before Installation
Remove the the charging station from its package. Do not scratch the surface of the the charg-
ing station after removal from the package.
When selecting installation site, take into account the following:
• The minimum space needed for operating and maintenance.
• Make sure that the mounting foundation is suitable and robust.
• In order to ensure the optimal charging performance, the the charging station should not
be exposed to direct sunlight.
• If the charging station is installed in conditions where there is a risk of metal rusting, vis-
ible metal surfaces must be protected with anti-corrosion agent.
Follow always national regulations and
site requirements
Recommendation
1200 mm
min. 400 mm
min. 200 mm