9 10
Step 1:Mount microinverters onto the rack
Mark out the estimated center of each PV module on the rack to facilitate locating microinverters..
Mount all microinvertes under modules to avoid rain and sun, with the trademark facing
downward.
Step 4: Fasten AC cables
Fasten AC cables and grounding cables to the rack with cable ties.
Step 5: Seal the unused connector of AC cable.
Insert the end cap directly into the connector on the unused end, and check if it is inserted
in place.
Step 6: Connect AC cable to the junction box
Connect AC cable to the input of the junction box.
Step 2: Grounding
Microinverters and modules must be connected to grounding conductor in accordance with
national standards.
Fix the grounding wire with screws to the microinverter’s grounding hole, so that the grounding of
microinverters can be realized.
Step 3: Connect microinverter AC cables serially
Connect the AC connectors on both sides of microinverters in a hand-in-hand way.