EasyManuals Logo

Envirovent energiSava 250 Installation Guide

Envirovent energiSava 250
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
9
AFTER INSTALLATION THE END USER SHOULD
KEEP THIS GUIDE FOR FUTURE REFERENCE
DO NOT
THROW AWAY
5. Fit the external supply and extract terminations.
6. Fit the supply and extract valves inside the property.
7. Fit the ductwork between the external terminations, the MVHR unit
and the supply and extract valves.
5 6
7
Ductwork should be fitted in
accordance with the Domestic
Ventilation Compliance Guide.
(Example RH unit configuration
shown).
Ducts to and from atmosphere and
through unheated spaces need to
be insulated.
All ductwork should be as large
a diameter as possible (min.
125mm) and use rigid duct or a
suitable semi-rigid duct system
such as Envirovent fast track.
Supply
Extract
Extract 1
Supply 1
Extract 2
Supply 2

Other manuals for Envirovent energiSava 250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Envirovent energiSava 250 and is the answer not in the manual?

Envirovent energiSava 250 Specifications

General IconGeneral
BrandEnvirovent
ModelenergiSava 250
CategoryHeating System
LanguageEnglish

Related product manuals