EasyManua.ls Logo

Epsolar LS0512 - Page 16

Epsolar LS0512
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Step 1: Wiring
The recommended connection order has been provided as Figure3-2
indicated. Be sure the negative and positive polarity connection is
correct and all terminals are tightened.
Figure 3-2 System wiring review
Step 2: Confirm power on
When battery power is applied and the controller starts up, the battery
LED indicators will be on. If the controller doesn't start up, or the
battery LED error exists, please refer to section 5 for troubleshooting.
Fuse
Battery
Fuse
Solar Module
1
1
3
2
1
1
Load
+
-
-
-
+
+