EasyManuals Logo

Epsolar LS0512 User Manual

Epsolar LS0512
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
22
Load LED
indicator
SLOWLY
FLASHING
Over load
Please reduce the
load and press the
button once, the
controller will
resume to work after
3s
Load LED
indicator
FAST
FLASHING
Short circuit
when the first
short-circuit occurs,
the controller will
automatically resume
to work after 10s;
when a second
short-circuit occurs,
press the button, the
controller will
resume to work after
3s
Notes: No LED indicator.
Measure battery voltage with multimeter.
Min.6V can start up the controller.
Notes: No charging status LED indicator with
normal connection. Measure the input voltage of
solar module, the input voltage must be higher
than battery voltage!

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epsolar LS0512 and is the answer not in the manual?

Epsolar LS0512 Specifications

General IconGeneral
BrandEpsolar
ModelLS0512
CategoryNetwork Router
LanguageEnglish