Installation Guide
8
Installation Work Flow
Follow the procedures below to mount the projector on a wall.
a
Installing the Setting Plate and the Projector (s p.23)
b
Adjusting the Projected Image (s p.34)
c
Calibrating the Interactive Pen (s p.41)
When installing the Touch Unit, finish installing the projector first, and then follow the procedures below.
a
Installing the Touch Unit (s p.47)
b
Adjusting the Angle of Laser Diffusion (s p.51)
c
Performing Touch Calibration (s p.62)