Installation Instruction
2.3 Equipment
The instructions in this document describe the installation, or use, of the
following hardware:
• RBS 3107 cabinet
• Earth grounding kit
• Power cables
• RF cables
• Transmission cables
• Alarm cables
• Site LAN cable
2.4 Conditions
The following conditions must be fulfilled before work starts:
Before Going to the Site
Before going to the site, ensure the following:
• Site access permission has been received
• The Site Installation Documentation is available
• All tools and instruments are available
Before Starting the Installation
Before starting the installation, ensure the following:
• The site is prepared according to the Site Installation Documentation
• The existing base frame is undamaged
• The ordered hardware is available
• The AC power supply for the RBS 3107 is installed and tested
• The site earth grounding is installed and tested
• The antenna system is installed and tested