EasyManuals Logo
Home>eta>Boiler>HACK

eta HACK Installation

eta HACK
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8 www.eta.co.at
Installation
Insert the new seals from the delivery scope.
If necessary, attach the seals with a spray
adhesive. This facilitates easier assembly;
otherwise the seals may slip during installation of the
combustion chamber stones.
Inserting the combustion chamber stones
Before starting, check the integrated seals of the
new combustion chamber stones for damage.
Insert the front and rear combustion chamber stones
and slightly push them apart.
Insert the left and right combustion chamber stones.
Then remove the jack.
Inserting the seal
Use a flat piece of metal or a chisel held upside down
(head on the seal) and tap the seal gently into position
without damaging it.
Installing in reverse order
Firmly tighten the grub screw to prevent slippage of the
combustion chamber stones.
Fig. 3-5: Grub screw

Other manuals for eta HACK

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the eta HACK and is the answer not in the manual?

eta HACK Specifications

General IconGeneral
Brandeta
ModelHACK
CategoryBoiler
LanguageEnglish

Related product manuals