17
Parts Required:
• Ash Clean-out Cover (Part #8) x1
Installation:
• There are two ears on the back
side of Ash Clean-out Cover (Part
#8).
• Put this cover into the hole, with
2 ears at orientation shown, then
turn 90 degree as shown.
Parts Required:
• Flame Tamer (Part #18) x1
Installation:
• Place Flame Tamer (Part #18)
over Fire pot. Locate using 3
Holes.