EasyManua.ls Logo

Extron electronics IPCP Pro 250 - Basic Setup Steps: a Guide to this Section and Other Resources

Extron electronics IPCP Pro 250
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IPCP Pro Series • Software-based Configuration and Control 26
Basic Setup Steps: a Guide to this Section and Other Resources
NOTE: GC projects can be created offline and uploaded to the hardware at a later date.
Follow the steps in Setup Checklist: How to Proceed With Installation starting on
page7. The overall process for setting up a control processor is as follows:
Configure the IP settings of
the control processor and the
TouchLink Pro touchpanels.
See “Network
Communication
Setup” in this
guide.
Create GUI layouts for the
touchpanels or other interfaces:
1. Start GUI Designer.
2. Create GUI layout designs for each
TouchLink Pro or third party
touchpanel (with a TouchLink
Interface), or for a computer or
mobile device (with LinkLicense).
3. Save and build the GUI layout le.
Create monitors, schedules,
macros, and local variables.
Congure ports on the
control processor.
Add touchpanels or other interfaces (if
used), import GUI layouts, congure
the touchpanels or interfaces.
Test the system, make adjustments,
nalize conguration.
Save the project.
Build and upload the conguration to
the control processor.
Will
TouchLink Pro or
third party touchpanels or
other user interfaces
be used?
No Yes
Create a new GC Professional or GC Plus project
and add the control processor to it.
Within Global Configurator
(GC Professional or
GC Plus mode):
Figure 18. Overall Configuration Steps
Network
Communication
Setup

Table of Contents

Related product manuals