10
1-4. Supplied Accessories
Operation Manual ----------------------------------------------------------------------------- 1
BNC cable -------------------------------------------------------------------------------------- 1
Power cord-------------------------------------------------------------------------------------- 1
Spare Fuse-------------------------------------------------------------------------------------- 1
Specifications are subject to change without notice.
2. INSTALLATION
2-1. Initial Inspection
This instrument was carefully inspected both mechanically and electrically before
shipment. It should be physically free of damage. To confirm this, the instrument
should be inspected for physical damage in transit. Also, check for supplied
accessories.
2-2. Connecting AC Power
This instrument requires ac 230V 50-60 Hz power through 3-conductor ac power
cable to be fit into three-contact electrical outlet to secure grounding. If forced to use 2-
conductor cable, use ground terminal in rear panel for grounding instrument.
CAUTION
THIS INSTRUMENT IS SET TO AC 230V. BEFORE POWERING ON THIS
INSTRUMENT, MAKE SURE THE VOLTAGE OF THE POWER SOURCE IS AC
230V.
2-3. Cooling and Ventilation
No special cooling and ventilation is required. However, the instrument should be
operated where the ambient temperature is maintained.
2-4. Position
This instrument is built as a bench-type instrument with rubber feet and tilt stand in
place. Stand-up angle can be adjusted by rotating angle of carrying handle.
2-5. Warming-Up
Allow more than 20 minutes for the unit to warm up so that it is stabilized and ready
for use.
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
FAX 781.665.0780 - TestEquipmentDepot.com